CALCUTTA SMITHFERRY ROAD SLIP REPAIR
Traffic will be reduced to one lane with control systems in place to have alternating traffic patterns in both directions during construction. The closure is expected to end on June 28, 2024.
Traffic will be reduced to one lane with control systems in place to have alternating traffic patterns in both directions during construction. The closure is expected to end on June 28, 2024.